Search this site
Embedded Files
JLHA NPDES Training
  • Home
  • Code Enforcement
    • CE NPDES 101
    • CE Role
    • CE Identifying Violations
    • CE Violation Response
    • CE Enforcement
    • CE Reporting
    • CE Lesson Check
  • Construction Inspectors
    • CI NPDES 101
    • CI Role
    • CI Identifying Violations
    • CI Enforcement
    • CI Inspecting LID
    • CI Reporting
    • CI Lesson Check
  • Plan Reviewers
    • PR NPDES 101
    • PR Role
    • PR Reviewing Plans
    • PR Inspecting LID
    • PR Reporting
    • PR Lesson Check
  • Public Works
    • PW NPDES 101
    • PW Role
    • PW Identifying Violations
    • PW Violation Response
    • PW Streets
    • PW Facilities
    • PW Landscaping
    • PW Sanitary Sewer
    • PW Water
    • PW Reporting
    • PW Lesson Check
JLHA NPDES Training

Previous Activity

Violation Response

Streets and Storm Drain O&M

Go through the sections below. You may skip this section if your job responsibilities do not involve street or storm drain O&M.

Purpose and Requirements

The purpose of this program is to protect waterways by:

  1. Preventing pollution to streets, generated by both the public and street O&M activities.

  2. Recovering pollution that has entered, or may enter, the storm drain system.

Requirements include the following:

  • Sweep curbed streets and agency-owned parking lots

  • Respond to and clean-up spills in the public right-of-way

  • Implement BMPs during all maintenance activities

Review the following presentation on required streets O&M BMPs.

Street Maintenance BMPs 2021.06.17

Click here for a poster of Road Reconstruction BMPs. This poster could be posted at applicable maintenance facilities and included in road reconstruction contract documents.

Review the following presentation on required storm drain O&M BMPs.

Storm Drain Maintenance BMPs

Next Activity

Fleet and Facilities O&M

Report abuse
Page details
Page updated
Report abuse