Search this site
Embedded Files
JLHA NPDES Training
  • Home
  • Code Enforcement
    • CE NPDES 101
    • CE Role
    • CE Identifying Violations
    • CE Violation Response
    • CE Enforcement
    • CE Reporting
    • CE Lesson Check
  • Construction Inspectors
    • CI NPDES 101
    • CI Role
    • CI Identifying Violations
    • CI Enforcement
    • CI Inspecting LID
    • CI Reporting
    • CI Lesson Check
  • Plan Reviewers
    • PR NPDES 101
    • PR Role
    • PR Reviewing Plans
    • PR Inspecting LID
    • PR Reporting
    • PR Lesson Check
  • Public Works
    • PW NPDES 101
    • PW Role
    • PW Identifying Violations
    • PW Violation Response
    • PW Streets
    • PW Facilities
    • PW Landscaping
    • PW Sanitary Sewer
    • PW Water
    • PW Reporting
    • PW Lesson Check
JLHA NPDES Training

Previous Activity

Enforcement

Verifying Implementation of Structural Control Measures

Go through the sections below.

LID Control Measures

Some land development projects require post-construction stormwater control measures. These controls are often called Low Impact Development (LID). LID controls mimic natural processes that result in the infiltration, evapotranspiration or use of stormwater in order to protect water quality.

Review the presentation below on common LID control measures.

Structural BMP Examples

LID Verification Inspections

When LID is required for a land development, the LID system specifications should be detailed on the site plans. It is your agency's responsibility to verify that LID controls are properly installed per plan.

Review the presentation below on the LID Control verification inspections.

Structural Control Inspections

Orange County presentation link (skip if in LA County)